               {"id":881,"date":"2020-12-26T19:13:16","date_gmt":"2020-12-26T18:13:16","guid":{"rendered":"http:\/\/ushagram-suisse.org\/projects\/individuals\/senegal1\/"},"modified":"2021-03-08T18:10:10","modified_gmt":"2021-03-08T17:10:10","slug":"senegal1","status":"publish","type":"page","link":"https:\/\/ushagram-suisse.org\/en\/projects\/individuals\/senegal1\/","title":{"rendered":"Project 2020 in Senegal &#8211; EN"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; fullwidth=&#8221;on&#8221; _builder_version=&#8221;4.7.7&#8243; background_color=&#8221;#800000&#8243; use_background_color_gradient=&#8221;on&#8221; background_color_gradient_start=&#8221;#800000&#8243; background_color_gradient_end=&#8221;#E02B20&#8243; background_color_gradient_direction=&#8221;330deg&#8221; locked=&#8221;off&#8221;][et_pb_fullwidth_header title=&#8221;One-time development project in Senegal&#8221; subhead=&#8221;Private fundraising &#8211; 2020&#8243; _builder_version=&#8221;4.7.7&#8243; title_font=&#8221;||||||||&#8221; background_color=&#8221;rgba (89,122,0,0,35)&#8221; use_background_color_gradient=&#8221;on&#8221; background_color_gradient_direction=&#8221;332deg&#8221; button_one_text_size__hover_enabled=&#8221;off&#8221; button_two_text_size__hover_enabled=&#8221;off&#8221; button_one_text_color__hover_enabled=&#8221;off&#8221; button_two_text_color__hover_enabled=&#8221;off&#8221; button_one_border_width__hover_enabled=&#8221;off&#8221; button_two_border_width__hover_enabled=&#8221;off&#8221; button_one_border_color__hover_enabled=&#8221;off&#8221; button_two_border_color__hover_enabled=&#8221;off&#8221; button_one_border_radius__hover_enabled=&#8221;off&#8221; button_two_border_radius__hover_enabled=&#8221;off&#8221; button_one_letter_spacing__hover_enabled=&#8221;off&#8221; button_two_letter_spacing__hover_enabled=&#8221;off&#8221; button_one_bg_color__hover_enabled=&#8221;off&#8221; button_two_bg_color__hover_enabled=&#8221;off&#8221;][\/et_pb_fullwidth_header][\/et_pb_section][et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.7.7&#8243; background_color=&#8221;#fffae9&#8243;][et_pb_row column_structure=&#8221;3_5,2_5&#8243; _builder_version=&#8221;3.25&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221;][et_pb_column type=&#8221;3_5&#8243; _builder_version=&#8221;3.25&#8243; custom_padding=&#8221;|||&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_text _builder_version=&#8221;4.7.7&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; width=&#8221;103.3%&#8221; min_height=&#8221;408px&#8221; custom_margin=&#8221;|-60px||||&#8221; custom_padding=&#8221;|3px||||&#8221; locked=&#8221;off&#8221;]<\/p>\n<h2>CONNECTING THE SCHOOL TO WATER FROM A NEARBY WELL &#8211; WATER AND SANITATION REHABILITATION (sn20-1)<\/h2>\n<p><strong>One-time development project for a primary school<\/strong><br \/><em>Beneficiairies: 680 children and 15 teachers in Keur Samba village, Mbour<br \/><\/em>Local managers: Mr Mademba Diop, agronomist, Pres. of the school management Committee; Mr Sall, school director.<\/p>\n<p><strong><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/ushagram-suisse.org\/wp-content\/uploads\/2021\/01\/kids-keurs-1024x597.jpg\" alt=\"\" class=\"wp-image-886 alignnone size-large\" width=\"1024\" height=\"597\" \/><br \/><\/strong><\/p>\n<div class=\"mce-content-body\" style=\"position: relative;\" contenteditable=\"true\">\n<p><strong>BUDGET<\/strong><\/p>\n<p><strong>Plumbing<\/strong><br \/>PVC pipe 25mm, length 200m = <em>donated<\/em><br \/>Immersion pump = <em>140 000 FCFA<\/em> = 215 EUR<br \/>Electrical connection = 40 000 FCFA = 62 EUR<br \/>Accessories and supplies = 95 000 FCFA = 146 EUR<br \/>Workmanship (3 days, 2 pers.) = 80 000 FCFA = 123 EUR<\/p>\n<p><strong>SUB-TOTAL PLUMBING = 355 000 FCFA = 545 EUR<\/strong><\/p>\n<p><strong>Rehabilitation works<\/strong><br \/>(Rehabilitation of toilets and bathrooms, emptying septic tanks,<br \/>renewing floors, securing the site)<br \/>Equipment = 149 000 FCFA = 201 EUR<br \/>Workmanship = 80 000 FCFA = 120 EUR<br \/>Emptying septic and unclogging = 50 000 = 75 EUR<br \/>Local coordination = 30 000 FCFA = 45 EUR<\/p>\n<p><strong>SUB-TOTAL REHAB WORKS = 279 000 FCFA = 464 EUR<\/strong><\/p>\n<p>Project set-up, management and follow-up = free<br \/><em>100% of collected funds go to the field <\/em><\/p>\n<p><em><strong>GRAND TOTAL = 1 009 EUR<br \/><\/strong><\/em><\/p>\n<p><em><\/em><\/p>\n<p><span style=\"font-size: 14px;\">_________________________________________________________________<\/span><\/p>\n<p><strong>DESCRIPTION<br \/><\/strong><br \/>The 12 classes with 680 children of the Keur Samba Laob\u00e9 public school in the Municipality of Malikunda have no access to water. They have to leave the school compound individually, cross the square and ask for water from neighbors.<\/p>\n<p>This is the case for drinking water but also for the water necessary for their hygiene. The school has toilets but no water&#8230;<\/p>\n<p>Although this is a public school created in 1998, the State does not have the means to support its development. It should receive an annual State subsidy in October, but it has not been paid so far. Aid is therefore necessary to meet its basic needs. Tuition fees are 1,500 FCFA \/ year (2.30 euros) but only 65% \u200b\u200bof parents can afford it.<\/p>\n<p>A well is located within the school compound but it is dry. It will have to be dug out eventually. In the meantime we can connect to a nearby well. See project below.<\/p>\n<p>Given the modest amount of this project, this fundraising will be done among our private network of friends and acquaintances.<\/p>\n<p><strong>THE CRECHE&#8230; <\/strong><\/p>\n<p>The cr\u00e8che housed within the school consists of a room with corrugated iron roofing, sand flooring, a few carpets on the floor and two window openings&#8230; It is comprised of 40 children and 3 teachers. Any surplus collected will be used to provide it with basic equipement, toys \/ games and teaching aids.<\/p>\n<p><strong>OTHER NEEDS&#8230; <\/strong><\/p>\n<p>Access to water is not the only need in the context of this school&#8230; There are only 175 benches seating 325 children out of 680, the classrooms are dilapidated, there is no equipment (whether sports or educational). There is no teacher&#8217;s room, there are no computers, there is no internet access, no library, etc.<\/p>\n<p>&nbsp;<\/p>\n<p><span>***********<\/span><\/p>\n<p><strong>LOCALISATION<\/strong><\/p>\n<p>The rural Municipality of Malikunda where the school is located is close (2km) to the town of Mbour with its 770,000 inhabitants and to Saly with its seaside tourist resorts. But it does not benefit from this neighbourhood. The area remains rural and destitute as if isolated from its richer neighbouring municipalities.<\/p>\n<p><a href=\"https:\/\/goo.gl\/maps\/FBipzR4TCgDLHp2w9\">https:\/\/goo.gl\/maps\/FBipzR4TCgDLHp2w9<\/a><\/p>\n<p>The Municipality of Malikunda is home to 40 schools like this one. The Keur Samba Laob\u00e9 school is ranked 4th best with a 72% success rate.<\/p>\n<p>&nbsp;<\/p>\n<\/div>\n<p><strong>\u00a0<\/strong><\/p>\n<p><span style=\"font-size: 14px;\"><\/span><\/p>\n<p>[\/et_pb_text][\/et_pb_column][et_pb_column type=&#8221;2_5&#8243; _builder_version=&#8221;3.25&#8243; custom_padding=&#8221;|||&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_text _builder_version=&#8221;4.7.7&#8243; _module_preset=&#8221;default&#8221; width=&#8221;91.6%&#8221; custom_padding=&#8221;2px|||||&#8221;]<\/p>\n<p><strong>OUR PROJECT<\/strong><\/p>\n<p>For 1000 euros, we propose to fit a submersion pump in a nearby well and to convey water directly to the two units of toilets and bathrooms (distance: 200m) and to provide taps. It will also be necessary to renovate the toilets, replace the damaged bowls and empty the septic tanks. One also needs to install doors, repair the roof, the gate of the school compound and secure the compound \u00a0(against acts of vandalism).<br \/> This represents the first essential phase of requirements.<\/p>\n<p> Any surplus fundraising will go to the other needs described above (in particular the equipment of the cr\u00e8che). The corresponding accounts and expenses and a completion report will be published on this page.<\/p>\n<p>[\/et_pb_text][et_pb_text _builder_version=&#8221;4.7.7&#8243; _module_preset=&#8221;default&#8221; width=&#8221;91.6%&#8221;]<\/p>\n<p><strong>NATIONAL CONTEXT<\/strong><\/p>\n<p>Senegal is 166th out of 189 in the world index of human development. It is 33rd out of 53 on the African continent, close to the score of Sudan and Madagascar. By way of comparison, Mauritania and Madagascar have a higher index (source UNDP). The youth represents more than 50% of the population. Its very high illiteracy rate is 43% (66% among women). Its GDP per capita is 163rd out of 195, with 2,570 USD \/ year, or $ 7 \/ day with a growth of 7% per year. But its distribution is highly uneven, 5% of households benefiting from 47% of the national income. By comparison, France is 31st, the United Kingdom 29th and Switzerland 9th. In 2016, the average salary was $ 80 \/ month, the African average being $ 156 and the world average of $ 858. In 2016, out of 16 million inhabitants, the population living below the poverty line was 7 million. In rural areas, 2 out of 3 inhabitants live below the poverty line. 70% of the population works in agriculture.<\/p>\n<p>[\/et_pb_text][et_pb_text _builder_version=&#8221;4.7.7&#8243; _module_preset=&#8221;default&#8221; width=&#8221;91.6%&#8221;]<\/p>\n<p><strong>LINKS<\/strong><\/p>\n<p><strong>&gt;<\/strong> <a href=\"https:\/\/bit.ly\/33hnW8p\">photo album<\/a><br \/> <strong>&gt;<\/strong> <a href=\"https:\/\/photos.app.goo.gl\/L1e6siL1ipb7SSHz5\">map<\/a><br \/> <strong>&gt;<\/strong> <a href=\"https:\/\/goo.gl\/maps\/FBipzR4TCgDLHp2w9\">localisation on Google Maps<\/a><\/p>\n<p>&nbsp;<\/p>\n<h3><span style=\"color: #ff0000;\"><strong>THIS PROJECT IS CLOSED!<\/strong><\/span><\/h3>\n<p><span style=\"color: #ff0000;\"><em>Completion report due in march 21<\/em><\/span><strong><\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><strong> Total budget: <br \/> 1 009 EUR<\/strong><\/p>\n<p><em>Any excess will go to the equipment of the cr\u00e8che and the <br \/> classrooms.<\/em><\/p>\n<p><em>Your donations will be credited to the association&#8217;s Paypal account and will be transferred to the School management Committee. We will personally do the project follow-up.<\/em><\/p>\n<p><em>A link to the project&#8217;s completion report with accounts and photos will be published on this page and the info circulated (also on <a href=\"https:\/\/facebook.com\/ushagram.suisse\/\" target=\"_blank\" rel=\"noopener\">Ushagram Suisse Association Facebook <\/a>page).<\/em><\/p>\n<p><em>Founded in 1999, the Ushagram Suisse Association, is a Swiss State recognised public charity.<\/em><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section][et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.9.0&#8243; _module_preset=&#8221;default&#8221; background_color=&#8221;#5b5b5b&#8221; global_module=&#8221;1620&#8243;][et_pb_row column_structure=&#8221;1_4,1_4,1_4,1_4&#8243; _builder_version=&#8221;4.9.0&#8243; _module_preset=&#8221;default&#8221;][et_pb_column type=&#8221;1_4&#8243; _builder_version=&#8221;4.9.0&#8243; _module_preset=&#8221;default&#8221;][et_pb_image src=&#8221;http:\/\/ushagram-suisse.org\/wp-content\/uploads\/2021\/03\/UG-logo_transp.png&#8221; title_text=&#8221;UG-logo_transp&#8221; url=&#8221;https:\/\/ushagram-suisse.org\/en\/&#8221; _builder_version=&#8221;4.9.1&#8243; _module_preset=&#8221;default&#8221;][\/et_pb_image][\/et_pb_column][et_pb_column type=&#8221;1_4&#8243; _builder_version=&#8221;4.9.0&#8243; _module_preset=&#8221;default&#8221;][et_pb_text _builder_version=&#8221;4.9.0&#8243; _module_preset=&#8221;default&#8221;]<\/p>\n<h4><span style=\"color: #e09900;\">ABOUT<\/span><\/h4>\n<p><a href=\"https:\/\/ushagram-suisse.org\/en\/about\/\"><span style=\"color: #f9f9f9;\">Who we are<\/span><\/a><br \/><a href=\"https:\/\/ushagram-suisse.org\/en\/team\/\"><span style=\"color: #f9f9f9;\">Teams and contacts<\/span><\/a><br \/><a href=\"https:\/\/ushagram-suisse.org\/en\/news\/\"><span style=\"color: #ffffff;\">News<\/span><span style=\"color: #f9f9f9;\"><\/span><\/a><br \/><a href=\"https:\/\/ushagram-suisse.org\/en\/documents-en\/\"><span style=\"color: #f9f9f9;\">Documents<\/span><\/a><\/p>\n<p>[\/et_pb_text][\/et_pb_column][et_pb_column type=&#8221;1_4&#8243; _builder_version=&#8221;4.9.0&#8243; _module_preset=&#8221;default&#8221;][et_pb_text _builder_version=&#8221;4.9.1&#8243; _module_preset=&#8221;default&#8221;]<\/p>\n<h4><span style=\"color: #e09900;\">ACTION<\/span><\/h4>\n<p><span style=\"color: #ffffff;\"><a href=\"https:\/\/ushagram-suisse.org\/en\/our-action\/\" style=\"color: #ffffff;\">Achievements<\/a><\/span><br \/><a href=\"https:\/\/ushagram-suisse.org\/en\/our-action\/impact-en\/\"><span style=\"color: #f9f9f9;\">Impact<\/span><\/a><a href=\"https:\/\/ushagram-suisse.org\/en\/documents-en\/\"><span style=\"color: #f9f9f9;\"><\/span><span style=\"color: #f9f9f9;\"><\/span><\/a><br \/><a href=\"https:\/\/ushagram-suisse.org\/projets\/institutions\/\"><span style=\"color: #f9f9f9;\">Institutional projects<\/span><\/a><br \/><a href=\"https:\/\/ushagram-suisse.org\/en\/projects\/individuals\/\"><span style=\"color: #f9f9f9;\">Private initiatives<\/span><\/a><br \/><a href=\"https:\/\/ushagram-suisse.org\/en\/our-action\/impact-en\/\"><span style=\"color: #f9f9f9;\"><\/span><\/a><\/p>\n<p>[\/et_pb_text][\/et_pb_column][et_pb_column type=&#8221;1_4&#8243; _builder_version=&#8221;4.9.0&#8243; _module_preset=&#8221;default&#8221;][et_pb_text _builder_version=&#8221;4.9.0&#8243; _module_preset=&#8221;default&#8221; custom_padding=&#8221;||0px|||&#8221;]<\/p>\n<h4><span style=\"color: #e09900;\">SUPPORT<\/span><\/h4>\n<p><a href=\"https:\/\/ushagram-suisse.org\/en\/support\/\"><span style=\"color: #f9f9f9;\">Becoming a member<\/span><\/a><br \/><a href=\"https:\/\/ushagram-suisse.org\/en\/support\/\"><span style=\"color: #f9f9f9;\">One-time donation<\/span><\/a><br \/><a href=\"https:\/\/ushagram-suisse.org\/en\/support\/\"><span style=\"color: #f9f9f9;\">Cofinancing a project<\/span><\/a><br \/><a href=\"https:\/\/ushagram-suisse.org\/en\/projects\/individuals\/volunteering\/\"><span style=\"color: #f9f9f9;\">Voluntary work in India<\/span><\/a><\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>CONNECTING THE SCHOOL TO WATER FROM A NEARBY WELL &#8211; WATER AND SANITATION REHABILITATION (sn20-1) One-time development project for a primary schoolBeneficiairies: 680 children and 15 teachers in Keur Samba village, MbourLocal managers: Mr Mademba Diop, agronomist, Pres. of the school management Committee; Mr Sall, school director. BUDGET PlumbingPVC pipe 25mm, length 200m = donatedImmersion [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":1031,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[20],"tags":[],"class_list":["post-881","page","type-page","status-publish","hentry","category-internalp-categ-an"],"_links":{"self":[{"href":"https:\/\/ushagram-suisse.org\/en\/wp-json\/wp\/v2\/pages\/881","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ushagram-suisse.org\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/ushagram-suisse.org\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/ushagram-suisse.org\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ushagram-suisse.org\/en\/wp-json\/wp\/v2\/comments?post=881"}],"version-history":[{"count":8,"href":"https:\/\/ushagram-suisse.org\/en\/wp-json\/wp\/v2\/pages\/881\/revisions"}],"predecessor-version":[{"id":2467,"href":"https:\/\/ushagram-suisse.org\/en\/wp-json\/wp\/v2\/pages\/881\/revisions\/2467"}],"up":[{"embeddable":true,"href":"https:\/\/ushagram-suisse.org\/en\/wp-json\/wp\/v2\/pages\/1031"}],"wp:attachment":[{"href":"https:\/\/ushagram-suisse.org\/en\/wp-json\/wp\/v2\/media?parent=881"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ushagram-suisse.org\/en\/wp-json\/wp\/v2\/categories?post=881"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ushagram-suisse.org\/en\/wp-json\/wp\/v2\/tags?post=881"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}